After applying for a new electricity connection from GEPCO (Gujranwala Electric Power Company), tracking the GEPCO Demand Notice becomes one of the primary concerns for applicants. This comprehensive guide explains the complete process of how to track your GEPCO Demand Notice online, including every stage your application goes through, and the benefits of using the online system.

If you have submitted an online application for a new connection, tracking the status of your demand notice is easy and can be done from home without needing to visit GEPCO offices. The same tracking method also applies to other electricity providers in Pakistan, including IESCO, LESCO, FESCO, MEPCO, PESCO, HESCO, SEPCO, QESCO, and TESCO.

How to Track GEPCO Demand Notice

To track your demand notice or application status, follow these step-by-step instructions:

  • Go to the Electricity New Connection (ENC) Portal through the GEPCO official website.
  • On the left sidebar, you will find multiple options such as:
    • Home
    • Apply
    • Change
    • Track
    • Print Form
    • Print DN
    • Pay DN
    • Upload DN
  • Click on the “Track” option.
  • You will see two categories:
    • New Connection
    • Change of Name/Tariff/Load

Since you are tracking the demand notice for a new connection, select the New Connection option.

  • Select your electricity company as GEPCO.
  • Enter your Tracking ID provided at the time of application submission.
  • Click the Submit button.
  • After submitting, a new window will display your current application stage.

The application generally takes about 60 days and passes through several stages mentioned below.

Complete Application Process Stages

Your demand notice application moves through multiple stages before completion. Each stage ensures that the necessary checks, verifications, and approvals are completed accurately.

  • New Application
    Initial submission of your new connection request.
  • Arrear Verification
    Verification of any pending dues or arrears related to previous services or bills.
  • Site Verification
    Physical inspection of your premises by GEPCO to ensure eligibility and compliance with requirements.
  • Prepare Service Connection Estimate (SCE)
    Preparation of cost and technical estimation for the new connection.
  • Approval of Application
    Review and approval of your application to proceed further.
  • Prepare GEPCO Demand Notice
    Preparation of the demand notice containing charges and fees applicable for the new connection.
  • Verify Demand Notice
    Cross-verification of the demand notice to eliminate any errors before issuance.
  • Prepare & Issuance of SCO (Service Connection Order)
    Preparation of SCO which authorizes the establishment of the new connection.
  • Prepare Store Requisition
    Procurement request for materials required like meters, wires, and equipment.
  • Approval of Store Requisition
    Approval of the requisition after checking the availability of requested materials.
  • Issuance of Material
    Issuing the necessary materials from GEPCO stores for installation.
  • Connection Information Update
    Updating new connection information into GEPCO’s database for records.
  • Meter Installed
    Installation of the electricity meter at the applicant’s premises by GEPCO personnel.
  • Send Information to Regional Office (RO)
    Submission of connection details to GEPCO’s regional office for record-keeping.
  • In Process
    Indicates that the process for establishing the connection is still ongoing.
  • Approve SCO
    Final review and approval of the service connection order.
  • Ready for Billing
    The new connection is added to GEPCO’s billing system and regular monthly billing starts.

Benefits of GEPCO Demand Notice Tracking

Using the online system for GEPCO Demand Notice tracking offers several advantages:

  • Convenience: Check your application status easily from the comfort of your home.
  • Time-Saving: Skip the hassle of visiting GEPCO offices — everything is just a click away.

Instant Updates: Get up-to-date information on your application’s progress anytime.

FAQs

Visit GEPCO’s ENC official website, click on “Track” from the sidebar, select “New Connection”, choose GEPCO from the company list, enter your Tracking ID, and click submit. Your current status will be displayed.

 You can pay your GEPCO Demand Notice online or by visiting designated GEPCO banks.

Yes, visit gepcoonlinebills.pk, enter your reference number, and download your current month’s electricity bill.

Visit the online complaint portal of GEPCO, enter your details, and click submit to register your complaint.

The GEPCO MIS system manages information related to customer service, infrastructure, billing, and overall operations.

Visit the helpline page on GEPCO’s official website to find helpline numbers for your area.

No, you need a reference number to check your GEPCO bill online.

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *