GEPCO New Connection 2025

GEPCO New Connection

Applying for a new GEPCO (Gujranwala Electric Power Company) connection is now simpler and more convenient, whether you’re doing it for your home, shop, or business. Thanks to the Electricity New Connection (ENC) system, users can now submit applications online, upload documents, pay fees, and track their application status from anywhere in Pakistan.

Ways to Apply for a GEPCO New Connection

You can apply using one of two methods:

  • Online via ENC Portal
  • Manual Submission at the GEPCO Office

 Applying Online via ENC Portal

Follow these steps to apply for a GEPCO new connection online using GEPCO’s ENC system:

Step-by-Step Process:

  • Visit the ENC Portal: Go to the official ENC website at https://enc.com.pk
  • Start the Application:
    Click on the “Apply” button. Fill in the required details, including your personal info, connection type (single or three-phase), and premises information.
  • Upload Documents (in JPEG format):
  • Attested copy of your CNIC
  • Attested CNIC of a witness
  • Property ownership documents
  • Neighbor’s GEPCO bill
  • Wiring contractor’s test report
  • Undertaking (stating no previous arrears or connection)
  • Passport-size photograph (if required)
  • Submit the Application Form: After uploading all documents, agree to the terms and submit the form.
  • Print the Application: Once submitted, download and print the application form for your records.
  • Compile Your File:
    Attach all the required documents along with the printed application form
  • Submit the File at GEPCO Office:
    Physically deliver your completed application file to your nearest GEPCO office. Failure to submit the file within 21 days will result in cancellation of the application.
  • Receive and Pay Demand Notice:
    After document verification, you’ll receive a demand notice. Pay it at the designated bank.
  • Submit Paid Demand Notice Copy:
    Submit the copy of the paid demand notice back to the GEPCO office.
  • Wait for Installation:
    Once payment is confirmed, GEPCO will schedule your meter installation

Manual Application Process at GEPCO Office

If you prefer to apply in person, visit the nearest GEPCO sub-divisional office and follow these steps:

  • Obtain the GEPCO New Connection Form:
    Collect it from the office or download from the ENC portal.
  • Prepare Required Documents:
  • CNIC copy of applicant
  • Property ownership document or lease agreement
  • Neighbor’s electricity bill
  • Wiring certificate
  • Undertaking
  • Witness CNIC (attested)
  • Recent photograph (if required)
  • Get Documents Verified:
    Have documents attested by an Oath Commissioner.
  • Submit the File:
    Submit the complete file to the GEPCO office and obtain a receipt.
  • Receive Demand Notice:
    GEPCO New Connection will issue a demand notice. Pay the required amount (usually PKR 9,000–12,000 depending on your location and wiring length).
  • Submit Proof of Payment:
    Provide the paid demand notice copy back to the office.
  • Connection Installation:
    After confirmation, your new electricity meter will be installed.

Important Considerations

  • Accuracy: Incomplete or incorrect forms will be rejected.
  • Verification: Submitting fake or forged documents may lead to legal action.
  • Timing: Application files must be submitted within 21 days of online submission.
  • Third-party Services: Stamp vendors outside GEPCO offices can prepare and submit files for a fee (usually PKR 500–700).

Track Your GEPCO New Connection Status

To monitor the status of your application:

  • Go to https://enc.com.pk
  • Click on the “Track” option.
  • Enter your CNIC or Tracking ID.
  • Click “Submit” to view your application progress.

GEPCO Demand Notice & Charges

Once your application is approved, a Demand Notice will be issued. It includes charges for:

  • Meter installation
  • Wiring up to 40 meters

Estimated cost: PKR 9,000 to PKR 12,000. If your premises are farther from the nearest electric pole, extra wiring costs may apply.

Required Documents Checklist

Here is a combined checklist of all documents needed:

  • Applicant’s CNIC (attested copy)
  • Witness’s CNIC (attested copy)
  • Property ownership proof (Registry/Allotment Letter/Fard)
  • Neighbor’s latest GEPCO bill
  • Wiring contractor’s test report
  • Undertaking (no previous dues)
  • Recent passport-size photograph
  • Printed online application form
  • NOC (if applicable)

Check your GEPCO Online bill Click here.

FAQs

 The fee usually falls between PKR 9,000 and PKR 12,000, depending on your location and installation needs.

Yes. Use the ENC portal https://enc.com.pk to submit your application from home.

 You need CNICs (applicant and witness), ownership documents, neighbor’s bill, wiring test report, and other supporting paperwork

Usually around 30 days for residential connections, though it may take longer for commercial or industrial installations.

Yes. You must submit the printed application and supporting documents to the GEPCO office within 21 days

Yes. Many stamp vendors outside GEPCO offices provide file preparation and submission services for a fee.

Visit the ENC portal, go to “Track,” and enter your CNIC or tracking number.

Your application may be cancelled, and you may face legal consequences.